Service Overview
Power Transmission
Power Tech Infra delivers end-to-end EPC and O&M solutions for Extra High Voltage (EHV) transmission systems — engineered for long-distance power transfer, maximum efficiency, and uncompromising safety. From initial survey and design to energization and long-term maintenance, we bring single-point accountability to every transmission project we undertake.
Our teams have executed projects across 33 kV to 400 kV voltage levels, working with State Transmission Utilities (STUs), DISCOMs, and private developers across Northern India. Every project is delivered on schedule, within budget, and to the highest standards of quality and safety.


400 KV
Max Voltage Capacity
30+
Transmission projects
7+
Years of expertise
24/7
Emergency response
Services Offered
Services Include
Service 1
EPC Projects — EHV Transmission Lines
• Complete turnkey execution of EHV transmission lines from 33 kV to 400 kV
• Tower foundation design, fabrication, galvanizing, and erection
• Conductor stringing, sagging, and tensioning as per IS/IEC standards
• Tower spotting, route survey, and right-of-way (ROW) coordination
• Earthing, lightning protection, and anti-climbing guard installation
• Pilot testing, pre-commissioning checks, and final commissioning
• Project execution across plains, forests, agricultural land, and challenging terrains




Service 2
EPC Projects — EHV Sub Stations
(up to 400 kV)
• Turnkey execution of Air Insulated Substations (AIS) from 33 kV to 400 kV
• Civil works: control room, switchyard, boundary wall, drainage, cabling trenches
• Electrical works: transformer erection, switchgear, bus-bar, CT/PT installation
• Protection and relay panel engineering, SCADA integration and HMI setup
• Earthing grid design and installation per IEEE 80 / IS 3043
• High voltage testing, relay coordination, and commissioning
• Documentation: as-built drawings, test reports, operation & maintenance manuals
Service 3
Emergency Restoration System (ERS)
(up to 400 kV)
• Rapid deployment of temporary lattice structures for storm or fault-damaged transmission lines
• Pre-fabricated ERS tower kits deployable within 24–72 hours of mobilization
• Line restoration without waiting for permanent tower fabrication or delivery
• Critical for utilities needing zero-downtime grid restoration after natural disasters
• In-house trained ERS teams with round-the-clock mobilization capability
• Post-restoration assessment and handover with full documentation




Service 4
O&M Services — Transmission Lines & Sub Stations
• Scheduled preventive maintenance for EHV lines and sub-stations
• Thermographic surveys, partial discharge testing, and condition monitoring
• Breakdown maintenance with guaranteed response time SLAs
• Vegetation management and right-of-way patrolling
• Sub-station equipment servicing: transformers, breakers, isolators, relays
• Annual maintenance contracts (AMC) for utilities and private asset owners
• Maintenance reporting and asset lifecycle management documentation
Our Pillar
Why Choose Us

Expert Engineers

Client First

Emergency Ready

Sustainability
TRUSTED BY
Our Clients
We are proud to have partnered with government utilities, DISCOMS, and private developers across Northern India. Our track record speaks for itself.
GET IN TOUCH
Ready to Discuss Your Transmission Project?
Talk to our engineering team — we respond within 24 hours.



